Call Us: 020 8744 5159

Why choose us »

No advance building contract – low advance payment

We do not require you to enter into a Building Contract until you have first approved the plans for your loft conversion or extension and all structural designs and regulatory approvals have been obtained or notices served.

As soon as you are happy with the estimate for the work the next step is to instruct us to prepare the drawings. At this stage an advance payment is needed to cover the detailed survey, plans and structural calculations. Payments for statutory fees will be requested as the design work progresses.

No other payments are required until the pre-start formalities when we meet with you in advance of the building works commencing on site.

If you haven’t already made an appointment, and would like some advice and general information or would like to book a free survey, please call:

020 8744 5159

Studio 150 Hill House, 210 Upper Richmond Road, London SW15 6NP